E7 Intermediate floor between dwellings (in blocks of flats) E7MCFF4

This is another horizontal junction for intermediate floors between dwellings where sound and fire are also important considerations. Again, a fire stop is needed to compartment the dwellings and this, as with the Party Wall Junction at Floor Level Detail, should have the same lambda value as the main cavity insulation and ensure a tight fit where it abuts.

Any penetrations through the floor should be properly fire-stopped and an appropriate acoustic barrier incorporated. Greater information regarding acoustic performance for specific floor details can be found at the Robust Details site.

Why is thermal bridging so important?

  • Registered Construction Details can enable an otherwise failing building to pass with no alteration to insulation levels or use of triple glazing or expensive renewable technologies.
  • Cost analysis shows savings as much as £1,200 on a 90m2 unit through correct specification and attention to detail.

Talk to your architect, designer or specifier about this, they can speak to the SAP assessor who can start designing out unnecessary costs. Find out more here.

About RCDs

Our Registered Construction Details provide free detailed drawings of thermal bridge junctions together with points to watch, specification and thermal properties of the key materials. They contain everything that’s needed to get the job right.

Comments

Add new comment

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Sign up to the building bulletin newsletter

Over 48,000 construction professionals have already signed up for the LABC Building Bulletin.

Join them and receive useful tips, practical technical information and industry news by email once every 6 weeks.

Subscribe to the Building Bulletin