EW31 Roger Bullivant Limited SystemFirst™ House Foundation System

Category

Roger Bullivant Limited SystemFirst™​ House Foundation System is used to construct ground beams and insulated suspended ground floors in dwellings and other similar low-rise buildings of masonry, timber or light-gauge steel framed construction.  Buildings should be limited to a maximum two storeys plus room-in-the-roof, in conjunction with piled and pier foundations produced by the certificate holder. It comprises an in-situ assembly of galvanised steel edge and internal support beams, galvanised steel channel section floor beams, insulation, in-situ concrete infill and fibre-reinforced screed.  

 

Valid until 11th July 2022

 

Please Note: Every care was taken to ensure the information was correct at the time of publication. Any written guidance provided does not replace the user’s professional judgement. It is the responsibility of the dutyholder or person carrying out the work to ensure compliance with relevant Building Regulations or applicable technical standards.

Documents

Roger Bullivant Limited
RB Walton Park
Hearthcote Road
Swadlincote
Derbyshire
DE11 9DU

01332 977300