Raft foundation basics

Blog Post
Raft foundation basics - picture of a raft foundation

A raft foundation is a reinforced concrete slab under the whole of a building or extension, 'floating' on the ground as a raft floats on water. This type of foundation spreads the load of the building over a larger area than other foundations, lowering the pressure on the ground.

This is an alternative if you can't use a traditional strip or trench fill foundations.

But it's important to note that raft foundations aren't suitable in all cases and usually need to be designed by a structural engineer.

Here are important considerations if you're thinking about using a raft foundation:

  • The raft design usually has an 'edge beam' formed by a cage of steel reinforcement, which will need to be carefully assembled on site. Internal stiffening beams are sometimes needed too. These beams transfer the building loads through the rest of the slab and then evenly over the ground.
  • A site investigation is usually needed for the engineer to understand what the ground is like. Very poor ground may mean you need a different solution such as piles.
  • The raft design will normally need a hardcore sub-base to level the ground. This stone should be mechanically compacted.
  • You must ensure steel reinforcement is lapped at least 450mm (for both mesh and mild steel bars) and provided with 40mm concrete cover. 'Treading in' the reinforcement during the concrete pour isn't a suitable means of placing reinforcement - use the special 'chairs' or 'soldiers' to support the mesh.
  • The edge of the raft must be carefully detailed for the damp course and membrane position, which may need a 'step' forming in the concrete at the raft edge.
  • Insulation is usually placed over the top of the raft - take care to avoid cold bridging at the junctions with external walls.

Important! A structural engineer designing a raft foundation may not be fully aware of damp coursing, cold bridging or land contamination issues. Ensure that the building designer considers these details before constructing the raft - once the concrete is poured it may be difficult to overcome.

If in doubt, speak to your local authority building control surveyor. Use our free post code search tool to find contacts for your local LABC team.

Banner image courtesy of Surtees Groundworks, Berkshire.

Find this page useful? Read more about working with foundations


Please Note: Every care was taken to ensure the information was correct at the time of publication. Any written guidance provided does not replace the user’s professional judgement. It is the responsibility of the dutyholder or person carrying out the work to ensure compliance with relevant building regulations or applicable technical standards.

This article was reviewed on 9 August 2023.

Comments

Foundations

Submitted 4 years 5 months ago

What soils do you typically build strip pad raft foundations on

Reply to: Foundations

Submitted 4 years 4 months ago

Hi, thanks for your comment.

This question would be best answered by your local authority building control team who can advise on designing the optimum foundation for your location and intended use. You can find the details of your local team by entering the postcode of your project in the 'find your council' bar at the top of our website.

Regards,

LABC

DIMS

Submitted 4 years 3 months ago

IS THERE A MINIMAL DEPTH OF THE EDGE BEAM AS I HAVE AN EXISTING PUBLIC DRAINAGE ISSUE TO BRIDGE OVER.

In reply to by PAUL THOMAS (not verified)

Reply

Submitted 4 years 3 months ago

Hello there

Thanks for your comment.

Foundation design will be specific to each site, taking into consideration the size and type of building together with ground conditions determined by site investigation. We recommend that you discuss the development with your chosen building control provider.

Kind regards,
LABC

Raft under conservatory

Submitted 3 years 10 months ago

Hi can I ask in your opinion if my daughter needed a raft under her new detention.Would she need a raft for a 4mtre x4 metre small conservatory too. Barbara Haycock

Reply

Submitted 3 years 10 months ago

Hello Barbara - thanks for leaving your comment.

Unfortunately we would need more detail to offer an opinion. You or your daughter would be best speaking to her local building control team. You can find their direct contact details by using the postcode search in the top righthand corner of this page.

Kind regards
Julie, LABC

step at edge of raft foundation is it structural

Submitted 3 years 10 months ago

is the step detail at edge of raft foundation formed for structural reason or dampcorse and coldbridgen

Reply

Submitted 3 years 10 months ago

Hello there - thanks for leaving your comment.

While the toe creating the downstand to the raft slab at the perimeter can offer greater stability, the main reason is that then doubles as a foundation and the floor of the building. With this detail it creates the 150mm height required above outside ground levels.

Kind regards
David, LABC

Trench foundation to Raft foundation

Submitted 3 years 8 months ago

I am receiving conflicting advice regarding building an extension on a trench foundation if the existing property is built on a raft foundation. What is the view of LABC ?

Reply

Submitted 3 years 8 months ago

Hello - thanks for getting in touch.

This is a difficult question to answer without understanding the site specifics.

However if the existing property is on a raft there will have been a reason why this method of construction was chosen originally. This could be things like; poor or filled ground, potential for subsidence, soft spots or voids, trees, high water table.

You should discuss this with your local building control team who may have the site history and an engineer who will be able to determine the likely foundation loadings and its suitability for the ground encountered.

You should also consider that there is a potential for differential settlement if two foundation types are used so provision for an expansion joint to mitigate any movement post completion should be included.

Kind regards
David, LABC

Add new comment

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Sign up to the building bulletin newsletter

Over 48,000 construction professionals have already signed up for the LABC Building Bulletin.

Join them and receive useful tips, practical technical information and industry news by email once every 6 weeks.

Subscribe to the Building Bulletin