Construction Details
P5MCFF2 Separating wall and roof with insulation at rafter level
Build Up
Party Masonry Cavity Wall
Separating Wall and Roof
2 x Leaves Dense Blockwork Party (Separating) Wall
Cavity fully filled with insulation
150mm insulation (λ = 0.044W/mK) between the rafters
50mm (λ =0.022W/mK) below the rafters
View DetailsE5MCPF9 Suspended beam and block floor – 150mm Insulation below screed
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block Inner Leaf λ ≤1.33 W/mK
Partial Fill Insulation
Beam and Block Floor
Lightweight Floor Block
150mm Insulation Below Screed (0.022W/mK)
View DetailsE5MCPF3 Suspended beam and block floor – 100mm Insulation below screed
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block Inner Leaf λ ≤1.33 W/mK
Partial Fill Insulation
Beam and Block Floor
Lightweight Floor Block
100mm Insulation Below Screed (0.022W/mK)
View DetailsE5MCFF9 Suspended Beam and Block Floor – 150mm Insulation Below Screed
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block λ ≤1.33 W/mK
Beam and Block Floor
Lightweight Floor Block
150mm Insulation Below Screed (0.022W/Mk)
View DetailsE5MCFF3 Suspended Beam and Block Floor – 100mm Insulation Below Screed
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block λ ≤1.33 W/mK
Beam and Block Floor
Lightweight Floor Block
100mm Insulation Below Screed (0.022W/Mk)
View Details