Construction Details
E6MCPF3 Intermediate floor within a dwelling
Date of publication:
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block Inner Leaf λ ≤1.33 W/mK
Partial Fill Insulation
Intermediate Timber Floor Within Dwelling
Timber Joist
View DetailsE6MCFF3 Intermediate Floor Within a Dwelling
Date of publication:
Build Up
External Masonry Cavity Wall
Masonry Outer Leaf (λ = 0.77)
Dense Concrete Block λ ≤1.33 W/mK
Full Fill Insulation
Intermediate Timber Floor Within Dwelling
Timber Joist
View Details