Skip to main content
 

User account menu

  • Login
 
Home
Menu

Main navigation

  • Homeowners
    • 5 steps to building regulations approval
    • Building control glossary
    • Do I need a completion certificate for building work in my house?
    • Getting started on your building project
    • **NEW** FAQs on Approved Inspector insurance issues
    • Where can I get a copy of my building certificate?
    • Why use someone in a Competent Person Scheme?
    • Why is building control important?
  • Professionals
  • About LABC
  • News
  • Awards
  • LABC Academy
  • Training
Browse

Main navigation

  • Homeowners
  • Professionals
  • About LABC
  • News
  • Awards
  • LABC Academy
  • Training
  • 5 steps to building regulations approval
  • Building control glossary
  • Do I need a completion certificate for building work in my house?
  • Getting started on your building project
  • **NEW** FAQs on Approved Inspector insurance issues
  • Where can I get a copy of my building certificate?
  • Why use someone in a Competent Person Scheme?
  • Why is building control important?
  • Building regulations guidance & documents
  • Building control qualifications
  • LABC services
  • Training
  • Building Bulletin email newsletter
  • Registration schemes
  • Construction Professionals' Standards Hub
  • Commercial developers
  • Housing developers
  • Contact
  • Careers
  • LABC Board of Directors
  • Charity of the year
  • Organisations we support
  • Reviews
  • Working with LABC
  • LABC Regions
  • Privacy policy
  • Copyright and ownership of LABC intellectual property
  • Meet the LABC team
  • What services do we offer on the website?
  • Why choose local council building control?
  • What are the building regulations?
  • Self build homes
  • Blog posts
  • Press releases
  • Research
  • Building Safety & Hackitt press releases, articles and resources
  • Awards process 2025
  • Awards team contact details
  • How to apply
  • What is a building control surveyor?
  • How do I become a building control surveyor?
  • Building Control Blog
  • Why do I need building control approval for my building project?
  • Why can I choose who does my building control?
  • Why are some private building inspectors facing problems?
  • What should Approved Inspectors do once their insurance has expired?
  • What's the process for transferring work from an AI that no longer has insurance to an LABC team?
  • Why does the project have to be reverted to the local Authority?
  • What does it cost to cancel an initial notice and revert work to my local council?
  • Why do I have to pay twice – once for the Approved Inspector and then for the LABC team?
  • What will the local authority surveyor do?
  • Can Approved Inspectors continue without the required insurance?
  • What is the status of any regulatory work done in a period where an Approved Inspector fails to secure renewal of their insurance?
  • Does a cancellation notice have to be issued by the Approved Inspector?
  • What information should I request from the Approved Inspector when reverting a project to the local council?
  • What happens if I only find out my AI has no insurance once the works are completed?
  • What is the Government and LABC doing to help this situation?
  • How can I get further information/updates?
  • Who are LABC?
  • Approved Documents and technical guidance England
  • Approved Documents and technical guidance Wales
  • Archive
  • Spotlight
  • Statutory guidance
  • Building control apprenticeships
  • Air tightness testing
  • Acoustic testing
  • Energy and sustainability
  • Get a quote
  • Structural warranties
  • Our training team
  • What people are saying about our conferences and training....
  • Training FAQS
  • CIOB Membership through LABC
  • LABC Assured
  • Partner Authority Scheme (PAS)
  • Registered Construction Details
  • Education projects
  • Fit-out projects
  • Healthcare
  • Hotel and leisure
  • Office developments
  • Retail
  • Sports stadiums and arenas
  • Masterminds of Construction: LABC (Video)
  • Conversions
  • New homes
  • Social housing
  • LABC and house builders
  • Building control jobs
  • What is a building control surveyor and how do I get to be one?
  • Daniel Anon - Trainee of the Year 2017 (Videos)
  • In the spotlight: Building Control Manager Angela Edwards
  • Introducing LABC Trainee of the Year 2016: Jack Pritchard!
  • My building control story - Seb Jackson
  • Technical support in building control
  • We're hiring
  • LDSA (London District Surveyors' Association)
  • Be part of the most significant change in construction in more than 30 years
  • Why not consider a career in building control with the opportunity to progress?
  • Building control – improving public safety

Members navigation

  • Partner Authority Scheme
  • Standards and practice
  1. Home
  2. Take control
  3. Building control glossary: acronyms and technical terms

Building control glossary: acronyms and technical terms

As with any industry, there are lots of technical terms and other jargon used in building control so this glossary should help get you up to speed.

Click a letter to jump to a section.

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

A

Accessibility

The ability to physically move around an area, whether you're young, old, less abled or physically encumbered.

AD

Approved Document – A practical guide on ways to comply with the functional requirements in the Building Regulations. See the full series of Approved Documents for England and for Wales.
 

AI

Approved Inspector – A company or individual authorised to carry out building control work in England and Wales.

 

Application

See Building Notice.

 

Apprenticeship Levy

A levy on UK employers in all sectors to fund new apprenticeships. Employers with a pay bill of more than £3 million each year have to set aside 0.5% of their payroll for training. Introduced in April 2017, its objectives are to boost productivity by investing in human capital, develop vocational skills and increase the quality of training.

 

AWFSS

Automatic water fire suppression system.

 

AWSS

Automatic water suppression system.

 

↑ Back to Top

B

Balustrade

A railing supported by balusters (pillars) which acts as a protective wall along the edge of a staircase, balcony, bridge or terrace.
 

Building Act 1984

The primary, enabling legislation that gives the government powers to make building regulations.
 

BC

Building control
 

BCB

Building control body – A legal enforcer of building regulations.
 

BIM

Building Information Modelling – The process of creating and managing digital information about a built asset.
 

Building Regulations 2010

The Building Regulations set out what qualifies as 'building work', what types of buildings are exempt (such as temporary buildings), procedures that you must follow when starting, carrying out, and completing building work, and requirements for building design and construction. Find out more about the Building Regulations in this video.
 

Building Notice

A building regulations application which doesn't require you to submit plans (like the Full Plans application) so it may be quicker to start building work. Work will be inspected as it progresses. Read more about this process.
 

↑ Back to Top

C

CABE

Chartered Association of Building Engineers
 

Cavity wall

A wall formed by an inner and outer wall (or 'skins') with a hollow space in-between them.
 

Change of use

A change to the main use of a building. The significance of the change and the resulting impact on the building or land around it will determine if something will be defined as a change of use.

 

CIC

Construction Industry Council
 

CIOB

Chartered Institute Of Building

 

Competent Person

A person who has relevant, recognised qualifications, is a member of a relevant professional organisation. Some work can be carried out without notifying building control if work is done by a Competent Person. Read our article on the subject.
 

Completion certificate

Issued by surveyors once they are happy that work meets building regulations. Find out how to get a completion certificate in our guide.

 

Conversion

A change in function or use of a property so that it serves a different purpose.
 

CPD

Continuing Professional Development. Read more about CPD with LABC.
 

CPS

Competent Persons Scheme – An installer registered with CPS is qualified to carry out specific types of work that complies with the building regulations. Find out more.
 

↑ Back to Top

D

Dangerous structure

A building or part of a building or other structure which, because of its condition, could endanger the public. Examples here.

DEA

Domestic Energy Assessor – A trained and qualified individual who can assess existing domestic dwellings and produce EPCs for use in property sales and rental markets.
 

DEBIS

Department for Business, Energy and Industrial Strategy. Formerly known as the Department of Energy and Climate Change (DECC).

 

Demolition

Partial or complete demolition of a structure or building. You must notify the local council of any demolition and planning permission may be needed. Further information.

 

DPC

Damp-proof course – Impermeable materials laid in the foundation walls/floor slab of buildings near the ground to prevent dampness from rising into the buildings.
 

DPM

Damp-proof membrane – A thin layer of material applied to a surface to prevent moisture transmission.

↑ Back to Top

E

Eaves

Part of a roof that meets or overhangs the walls of a building.

 

Energy efficiency

Energy efficiency in buildings is aided by things like heating from renewable resources, insulation, draught-proofing, lighting and radiators. Read our guide on how to make your home energy efficient.
 

EPC

Energy Performance Certificate – Required for properties when constructed, sold or let. The EPC provides details on the property's energy performance and what you can do to improve it.
 

EPR

Energy Performance Report – An EPC which is not officially lodged in the Government's central database.

↑ Back to Top

F

FMB

Federation of Master Builders
 

Full Plans application

With this type of building regulations application a building control team will check and 'approve' your plans before work starts. Read more about this process.
 

↑ Back to Top

G

GHA

Good Homes Alliance
 

Ground heave

Heave occurs when the ground, usually made up of clay soil, expands and swells when wet. The soil cannot expand downwards or sideways so it moves upwards and this can cause building foundations to move, potentially damaging structures. Read more about it in our popular article: recognise signs of ground heave.

↑ Back to Top

H

HCR

Home Condition Report – A report developed by the Royal Institution of Chartered Surveyors (RICS) to provide a succinct overview of a residential property and highlight areas that may require varying degrees of attention.
 

HI

Home Inspector – A trained and qualified individual who can undertake a Home Condition Report (HCR) and Energy Performance Certificates (EPC).
 

HMO

A house in multiple occupation, or a house of multiple occupancy. A HMO is a residential property which has at least 3 tenants, forming more than 1 household, who share facilities such as the kitchen, toilet and bathroom.
 

HRRB

High-rise residential building
 

HSE

Health and Safety Executive – An independent regulator which helps employers manage risks correctly and helps workers understand how they can stay safe and well.
 

↑ Back to Top

I

Inspection

An inspection (or site inspection) will be carried out at certain stages throughout your building works after a building control application has been approved. Read about the Building control approval process.
 

 

↑ Back to Top

J

JCA

Joint Competent Authority – One of the key recommendations from the Hackitt Review was the creation of a new Joint Competent Authority comprising of Local Authority Building Standards (LABS), fire and rescue authorities and the Health and Safety Executive (HSE) to oversee management of safety risks in high-rise residential buildings (HRRB) across their entire life cycle.
 

Joist

A length of timber or steel which supports part of the structure of a building, typically a floor or ceiling. Read our popular blog post about solid timber joists.

↑ Back to Top

K

kWh

Kilowatt-hour – A unit for electricity.
 

↑ Back to Top

L

LABC Warranty

Their partnership with LABC (since 2007) means that they can provide building control and structural warranties throughout England and Wales using the combined technical expertise of over 3,700 surveyors. All of their policies are underwritten by 'A' rated global insurers, ensuring buyers are protected for the duration of the policy. Find out more about LABC Warranty.
 

LABSS

Local Authority Building Standards Scotland – A not-for-profit membership organisation which represent Scotland's 32 local authority building standards services – the only appointed verifiers for their geographical area.
 

Lap

The overlapping or projecting part of a roof panel.
 

LEL

Low energy lighting – A building with LEL has a low energy demand. There are various types of low energy light bulbs available, such as LED and compact fluorescent.
 

Load-bearing wall

An active structural part of a building that supports the weight of the elements above it, a roof for example.
 

LZC

Low to zero carbon – Energy sources which are increasingly being installed in buildings, for example: micro CHP, photovoltaic panels, solar panels and wind turbines.
 

↑ Back to Top

M

MHCLG

Ministry of Housing, Communities and Local Government (previously known as DCLG).
 

↑ Back to Top

N

NHBC

National House Building Council
 

↑ Back to Top

O

 


 

↑ Back to Top

P

Party wall

A wall which stands on the boundary of land belonging to two (or more) different owners. Find out more about working with party walls.
 

PI

Professional Indemnity – Insurance that protects professional persons from costs they may have to pay as compensation to clients because of problems with work undertaken.
 

PIR

Passive infrared sensors – commonly used in automatically-activated lighting systems and burglar alarms.
 

PL

Public liability – Insurance that covers against loss, or of damage to, third party property, or persons, arising from the activities of a business.

 

Planning permission

Formal permission from a local authority to erect or alter a building. Read What's the difference between planning permission and building regulations?

 

PL

Plasticity – How much soils or clay will change volume or transform depending on their water content. View Foundations on clay soil for examples of this  

 

Pressure Testing

Tests which detect uncontrolled air leakage paths within the external envelope of the dwelling. The process is required in England, Wales and Northern Ireland to comply with Building Regulations. LABC can provide this testing as well as many other services.
 

PV

PhotoVoltaics – Modules which convert sunlight directly into DC electricity and can be integrated into buildings.
 

↑ Back to Top

Q

QCA

Qualifications and Curriculum Authority work closely with government and other agencies to maintain and develop the national curriculum and associated assessments, tests and examinations.
 

↑ Back to Top

R

Rafter

A beam forming part of the internal framework of a roof.
 

Regularisation

The process of making a retrospective application for building regs approval for unauthorised works carried out previously.
 

Rendering

The process of applying cement mixture to walls to achieve a smooth or textured surface. A similar technique to plastering.
 

RICS

Royal Institution of Chartered Surveyors – A professional body promoting and enforcing international standards in the valuation, management and development of land, real estate, construction and infrastructure.

 

RSJ

Rolled Steel Joist.
 

RSL

Registered Social Landlord – Government-funded, not-for-profit organisations that provide affordable housing for people in need.
 

↑ Back to Top

S

SAP

Standard Assessment Procedure – Methodology used by the Government to assess and compare the energy and environmental performance of dwellings.
 

 

Site inspection

See Inspection.

 

Strut

A rod or bar which forms part of a framework, designed to resist compression.

 

Stud wall

An interior wall consisting of a frame of vertical timbers and covered with plasterboard.

 

↑ Back to Top

T

Truss

A framework, typically consisting of rafters, posts, and struts, supporting a roof or other structure.
 


 

↑ Back to Top

U

Underpinning

A solid foundation laid below ground level to support or strengthen a building. Find out more in our popular post: underpinning existing foundations.
 

UPRN

Unique Property Reference Number – Each building in the UK is given one by the government.
 

↑ Back to Top

V

 


 

↑ Back to Top

W

Water

Sanitation, hot water safety and water efficiency are covered under Approved Document G of the Building Regulations.
 

Waterproofing

Information on the resistance to water of roofs, walls and floors is contained within Approved Document C.


 

↑ Back to Top

X

 


 

↑ Back to Top

Y

 


 

↑ Back to Top

Z

 


 

↑ Back to Top

Footer

  • Homeowners
    • Getting started
    • Where do I get a copy of my building certificate?
    • Do I need a building regs application?
    • Front Door (home improvements website)
  • Professionals
    • LABC Services
    • Registration schemes
    • Building Regs documents
    • Commercial developments
    • Housing developments
    • Site inspection app
  • About LABC
    • Building control jobs
    • Reviews
    • Why choose LABC?
    • Scotland
  • News & blog
    • Blog
    • News
    • Press releases
  • LABC Warranty
LABC logo © 2025 LABC Membership website design by IE Digital

Contact

General - info@labc.co.uk

Footer menu

  • Privacy policy
  • Contact details
  • Copyright notice
  • Admin login
  • Accessibility

Connect with us

  • Facebook
  • Linked In
  • Twitter
  • Homeowners
    • 5 steps to building regulations approval
    • Building control glossary
    • Do I need a completion certificate for building work in my house?
    • Getting started on your building project
    • **NEW** FAQs on Approved Inspector insurance issues
      • Why do I need building control approval for my building project?
      • Why can I choose who does my building control?
      • Why are some private building inspectors facing problems?
      • What should Approved Inspectors do once their insurance has expired?
      • What's the process for transferring work from an AI that no longer has insurance to an LABC team?
      • Why does the project have to be reverted to the local Authority?
      • What does it cost to cancel an initial notice and revert work to my local council?
      • Why do I have to pay twice – once for the Approved Inspector and then for the LABC team?
      • What will the local authority surveyor do?
      • Can Approved Inspectors continue without the required insurance?
      • What is the status of any regulatory work done in a period where an Approved Inspector fails to secure renewal of their insurance?
      • Does a cancellation notice have to be issued by the Approved Inspector?
      • What information should I request from the Approved Inspector when reverting a project to the local council?
      • What happens if I only find out my AI has no insurance once the works are completed?
      • What is the Government and LABC doing to help this situation?
      • How can I get further information/updates?
      • Who are LABC?
    • Where can I get a copy of my building certificate?
    • Why use someone in a Competent Person Scheme?
    • Why is building control important?
  • Professionals
    • Building regulations guidance & documents
      • Approved Documents and technical guidance England
        • Approved Document A: Structure
        • Approved Document B: Fire Safety – Volumes 1 & 2
        • Approved Document C: Site preparation and resistance to contaminants and moisture
        • Approved Document D: Toxic substances
        • Approved Document E: Resistance to the ​passage of sound
        • Approved Document F: Ventilation
        • Approved Document G: Sanitation, hot water safety and water efficiency
        • Approved Document H: Drainage and waste disposal
        • Approved Document J: Combustion appliances and fuel storage systems
        • Approved Document K: Protection from falling, collision and impact
        • Approved Document M: Access to and use of buildings
        • Approved Document P: Electrical safety - Dwellings
        • Approved Document Q: Security - Dwellings
        • Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks
        • Approved Document L: Conservation of fuel and power
        • Building Regulations - Regulation 7: Materials and workmanship
      • Approved Documents and technical guidance Wales
        • Wales Approved Document K: Protection from falling, collision and impact
        • Wales Approved Document A: Structure
        • Wales Approved Document Part B: Fire Safety
        • Wales Approved Document Part C: Site preparation and resistance to contaminants and moisture
        • Wales Approved Document Part D: Toxic substances
        • Wales Approved Document Part E: Resistance to the passage of sound
        • Wales Approved Document F: Means of ventilation
        • Wales Part G: Sanitation, hot water safety and water efficiency
        • Wales Approved Document H: Drainage and waste disposal
        • Wales Approved Document J: Combustion appliances and fuel storage systems
        • Wales Approved Document L: Conservation of fuel and power
        • Wales Part M: Access to and use of buildings
        • Wales Approved Document N: Glazing
        • Wales Approved Document P: Electrical safety - Dwellings
        • Wales Approved Document Q: Security - Dwellings
        • Wales Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks
        • Wales Approved Document to support regulation 7: Materials and workmanship
      • Archive
        • Archived Approved Documents
        • Archived Guidance
        • Archived statutory information
      • Spotlight
        • Circulars
        • Mandatory Fire Suppression for Wales - A Technical Guide
      • Statutory guidance
    • Building control qualifications
      • Building control apprenticeships
        • Register your interest in the apprenticeship degree webinar
    • LABC services
      • Air tightness testing
      • Acoustic testing
      • Energy and sustainability
      • Get a quote
      • Structural warranties
    • Training
      • Our training team
      • What people are saying about our conferences and training....
      • Training FAQS
        • How do I book a course?
        • What is CPD?
        • I'm not sure which training course is right for me
        • Will my course count towards my CPD?
        • What do I do if I want to attend a course but there are none in my region?
        • Will I receive confirmation of my booking?
        • How do I pay for an LABC training course?
        • What are LABC's booking terms and conditions?
        • What is LABC Pre-Pay?
        • What is a purchase order number?
        • Where do I send my purchase order number?
        • Will my invoice need to be paid before I attend a course?
        • Who do I contact if I have invoicing queries?
        • What if I haven't received the joining instructions?
        • What do I need to bring with me to the course?
        • What's the dress code?
        • Who'll be running the course?
        • Will lunch be provided?
        • Can I transfer my place to someone else?
        • I can't find the answer to my question!
      • CIOB Membership through LABC
    • Building Bulletin email newsletter
    • Registration schemes
      • LABC Assured
      • Partner Authority Scheme (PAS)
        • Partner Authority Scheme application form
      • Registered Construction Details
    • Construction Professionals' Standards Hub
    • Commercial developers
      • Education projects
      • Fit-out projects
      • Healthcare
      • Hotel and leisure
      • Office developments
      • Retail
      • Sports stadiums and arenas
      • Masterminds of Construction: LABC (Video)
    • Housing developers
      • Conversions
      • New homes
      • Social housing
      • LABC and house builders
  • About LABC
    • Contact
    • Careers
      • Building control jobs
      • What is a building control surveyor and how do I get to be one?
      • Daniel Anon - Trainee of the Year 2017 (Videos)
      • In the spotlight: Building Control Manager Angela Edwards
      • Introducing LABC Trainee of the Year 2016: Jack Pritchard!
      • My building control story - Seb Jackson
      • Technical support in building control
      • We're hiring
    • LABC Board of Directors
    • Charity of the year
    • Organisations we support
    • Reviews
    • Working with LABC
    • LABC Regions
      • LDSA (London District Surveyors' Association)
        • LDSA region contact details
    • Privacy policy
    • Copyright and ownership of LABC intellectual property
    • Meet the LABC team
    • What services do we offer on the website?
    • Why choose local council building control?
    • What are the building regulations?
  • News
    • Self build homes
    • Blog posts
    • Press releases
    • Research
    • Building Safety & Hackitt press releases, articles and resources
  • Awards
    • Awards process 2025
    • Awards team contact details
  • LABC Academy
    • How to apply
    • What is a building control surveyor?
    • How do I become a building control surveyor?
    • Building Control Blog
      • Be part of the most significant change in construction in more than 30 years
      • Why not consider a career in building control with the opportunity to progress?
      • Building control – improving public safety
  • Training