Skip to main content
 

User account menu

  • Login
 
Hafan
Dewislen

Main navigation

  • Chi sy'n rheoli
  • Gweithwyr proffesiynol
    • Canllawiau Rheoliadau Adeiladu
    • Cymwysterau rheoli adeiladu
    • Gwasanaethau LABC
    • Hyfforddiant
    • Building Bulletin email newsletter
    • Cynlluniau cofrestru
    • Hwb Safonau'r Adeiladwyr Proffesiynol
    • Datblygwyr masnachol
    • Housing developers
  • Amdanom LABC
  • Newyddion
  • Gwobrau
  • LABC Academy
  • Training
Pori

Main navigation

  • Chi sy'n rheoli
  • Gweithwyr proffesiynol
  • Amdanom LABC
  • Newyddion
  • Gwobrau
  • LABC Academy
  • Training
  • 5 cam i gael cymeradwyaeth rheoliadau adeiladu
  • Cwestiynau cyffredin i berchnogion tai
  • Building control glossary
  • Ydw i angen cais rheoliadau adeiladu (prosiectau penodol)...?
  • Oes angen tystysgrif gwblhau ar gyfer gwaith adeiladu yn fy nhŷ?
  • Dechrau ar eich prosiect adeiladu
  • **NEW** FAQs on Approved Inspector insurance issues
  • Sut mae gwneud cais Rheoliadau Adeiladu?
  • Sut mae'r LABC yn eich helpu i osgoi adeiladwyr diegwyddor
  • Ble galla’i gael copi o fy nhystysgrif adeiladu?
  • Pam dylwn i ddefnyddio rhywun mewn Cynllun Personau Cymwys (CPS)?
  • Pam mae rheoli adeiladu'n bwysig?
  • Canllawiau Rheoliadau Adeiladu
  • Cymwysterau rheoli adeiladu
  • Gwasanaethau LABC
  • Hyfforddiant
  • Building Bulletin email newsletter
  • Cynlluniau cofrestru
  • Hwb Safonau'r Adeiladwyr Proffesiynol
  • Datblygwyr masnachol
  • Housing developers
  • Contact
  • Gyrfaoedd
  • LABC Board of Directors
  • Charity of the year
  • Sefydliadau rydyn ni'n eu cefnogi
  • Adolygiadau a geirdaon
  • Gweithio gyda'r LABC
  • Rhanbarthau'r LABC
  • Polisi preifatrwydd
  • Copyright and ownership of LABC intellectual property
  • Meet the LABC team
  • Pa wasanaethau rydyn ni'n eu cynnig ar y wefan?
  • Pam dewis rheoli adeiladu awdurdod lleol?
  • Beth yw'r Rheoliadau Adeiladu?
  • LABC Publishing
  • Self build homes
  • Blog posts
  • Press releases
  • Research
  • Building Safety & Hackitt press releases, articles and resources
  • Awards region deadlines
  • Awards team contact details
  • How to apply
  • What is a building control surveyor?
  • How do I become a building control surveyor?
  • Building Control Blog
  • Beth yw rheoli adeiladu?
  • Fideo: Beth yw’r rheoliadau adeiladu?
  • Will I need building control?
  • A fydd angen cymeradwyaeth rheoliadau adeiladu ar fy mhrosiect adeiladu?
  • Felly sut mae’r broses gymeradwyo’n gweithio?
  • What type of building regulations application do I need?
  • Faint fydd hyn yn ei gostio?
  • A fydd angen cymeradwyaeth rheoliadau adeiladu ar fy ngwelliannau bach i'r cartref?
  • Beth yw’r gwahaniaeth rhwng caniatâd cynllunio a rheoliadau adeiladu?
  • Pa mor hir mae’n ei gymryd i brosesu cais?
  • A oes angen i mi wneud cais rheoliadau adeiladu wrth osod ffitiad rheoledig mewn adeilad eithriedig?
  • Ydw i angen Cais Rheoliadau Adeiladu?
  • Which building control authority should I use?
  • I've been affected by the expiry of my Approved Inspector's insurance - what do I do?
  • A oes rhaid i mi ddweud wrth fy nghymdogion am fy nghynlluniau adeiladu?
  • Ble galla’i gael copi o'r dogfennau Rheoliadau Adeiladu?
  • Sut mae gwneud cais Rheoliadau Adeiladu?
  • A oes cosbau am beidio â chydymffurfio â’r Rheoliadau Adeiladu?
  • Rydw i’n meddwl gwerthu fy nhŷ – fydd arna’i angen cymeradwyaeth am waith adeiladu a wnaethpwyd cyn i mi fod yn berchen ar y tŷ?
  • Does gen i ddim y caniatâd iawn ar gyfer gwaith adeiladu - beth wna'i?
  • A gaf apelio os caiff fy nghais Cynlluniau Llawn ei wrthod?
  • Beth ddylwn i ei wneud os yw’r gwaith wedi mynd o chwith?
  • Alla'i apelio yn erbyn hysbysiad gorfodi?
  • Help - ni chawsom ganiatâd ar gyfer ein gwaith adeiladu! (Fideo)
  • Can I get retrospective building control approval?
  • Rydw i'n adeiladu addasiad atig - oes gennych chi gyngor Rheoliadau Adeiladu?
  • Oes angen cymeradwyaeth rheoliadau adeiladu i addasu fy garej?
  • A oes angen rheoliadau adeiladu ar gyfer fy estyniad?
  • Ystafell wydr
  • Oes angen cymeradwyaeth rheoliadau adeiladu ar gyfer gwaith trydanol?
  • Oes angen cymeradwyaeth rheoliadau adeiladu i wneud newidiadau mewnol?
  • Islawr
  • Porth
  • Why do I need building control approval for my building project?
  • Why can I choose who does my building control?
  • Why are some private building inspectors facing problems?
  • What should Approved Inspectors do once their insurance has expired?
  • What's the process for transferring work from an AI that no longer has insurance to an LABC team?
  • Why does the project have to be reverted to the local Authority?
  • What does it cost to cancel an initial notice and revert work to my local council?
  • Why do I have to pay twice – once for the Approved Inspector and then for the LABC team?
  • What will the local authority surveyor do?
  • Can Approved Inspectors continue without the required insurance?
  • What is the status of any regulatory work done in a period where an Approved Inspector fails to secure renewal of their insurance?
  • Does a cancellation notice have to be issued by the Approved Inspector?
  • What information should I request from the Approved Inspector when reverting a project to the local council?
  • What happens if I only find out my AI has no insurance once the works are completed?
  • What is the Government and LABC doing to help this situation?
  • How can I get further information/updates?
  • Who are LABC?
  • Dogfennau Cymeradwy a chanllawiau technegol Lloegr
  • Approved Documents and technical guidance Wales
  • Archive
  • Ffocws
  • Canllawiau statudol
  • Prentisiaethau rheoli adeiladu'r LABC
  • Air tightness testing
  • Archwiliadau mynediad
  • Acwsteg
  • Gwasanaethau ynni
  • Peirianneg Tân
  • Asesiadau risg tân
  • Get a quote
  • Gwarantau adeileddol
  • Hyfforddiant mewnol
  • Our training team
  • What people are saying about our conferences and training....
  • Cwestiynau cyffredin hyfforddiant
  • Aelodaeth o'r CIOB drwy'r LABC
  • LABC Assured
  • Partner Authority Scheme (PAS)
  • Registered Construction Details
  • Education projects
  • Fit-out projects
  • Healthcare
  • Office developments
  • Retail
  • Sports stadiums and arenas
  • Meistri Adeiladu: LABC (Fideo)
  • Conversions
  • Cartrefi newydd
  • Social housing
  • LABC and house builders
  • Building control jobs
  • Beth yw syrfëwr rheoli adeiladu a sut galla'i fod yn un?
  • Daniel Anon - Trainee of the Year 2017 (Videos)
  • In the spotlight: Building Control Manager Angela Edwards
  • Introducing LABC Trainee of the Year 2016: Jack Pritchard!
  • My building control story - Seb Jackson
  • Technical support in building control
  • We're hiring
  • LDSA (London District Surveyors' Association)
  • Be part of the most significant change in construction in more than 30 years
  • Why not consider a career in building control with the opportunity to progress?
  • Building control – improving public safety

Members navigation

  • Partner Authority Scheme
  • Standards and practice
  1. Hafan
  2. Mandatory Fire Suppression for Wales - A Technical Guide

Mandatory Fire Suppression for Wales - A Technical Guide

The Welsh Government has amended Approved Document B volumes 1 and 2, with new regulations and guidance to be implemented on 1st January 2016.

The amendments to the documents arise from the Domestic Fire Safety (Wales) Regulations, resulting in a new Section 7A ‘Automatic Fire Suppression Systems’ in the Building Regulations 2010 Statutory Instrument. Section 7A introduces regulations 37A and 37B, requiring all new ‘domestic premises’ to have a fire suppression system installed.

A fire suppression system is defined as an automatic system that controls and extinguishes fires without human intervention. Typically these are sprinkler systems, although other types are available.

This guide refers mainly to fire sprinkler systems.

Where and when

The requirements apply throughout Wales from 1st January 2016 and apply to new build and change of use applications forming:

  • New houses and flats
  • Care homes
  • Rooms for residential purposes (other than in a hotel, hospital, prison or short stay leisure hostel)
  • Registered group homes and sheltered housing

The transitional provisions are as usual – applications deposited after 1st January 2016 and applications already submitted but commenced after 1st January 2017 must include fire suppression.

The new Approved Documents

Note that the requirement to provide fire suppression is statutory. This means that sprinklers are mandatory, compensatory features cannot be added to the building to avoid their inclusion.

The new Approved Documents for Part B (Wales) contain guidance as follows:

  • Both documents contain a new Section 2 in B1 ‘Residential Automatic Fire Suppression Systems’
  • Section 2 requires suppression systems to be designed and installed to BS 9251 and 9252 or other ‘equivalent standard’, neither specifically including or precluding other suppression systems such as water mist: innovative systems must be ‘designed and tested for use in domestic buildings and be fit for their intended purpose’
  • The system should cover the whole dwelling, except fire separated garages etc. The common parts or ancillary areas within blocks of flats are not included. Neither are bathrooms under 5m2, cupboards under 2m2 and concealed voids.
  • Where a building with an existing suppression system is altered or extended the system should be revised as necessary to ensure cover of all areas (not applicable to those without suppression).
  • Guidance is given on means of water supply to the system.
  • An appendix outlines requirements for maintenance of suppression systems and the information to be given to property owners to maintain their systems.

View Approved Document B volumes 1 and 2 for Wales

Sprinkler myths exploded

  • Sprinkler heads do not all activate in the event of a fire. This only happens in the movies. In the event of a fire individual sprinkler heads will activate once the air around the head reaches a certain temperature.
  • Sprinklers create significantly less water damage than fire service firefighting operations.
  • Sprinklers do not ‘false alarm’ as they only operate on elevated air temperature, not in response to smoke particles. Burning the toast will not result in activation of the sprinkler system.

Design benefits

Some of the guidance in Approved Document B has been amended due to the fire safety benefits of having a fire suppression system installed. This includes:

  • Houses over 4.5m can be served by a single protected stair
  • Guidance on fire service access is amended to increase the maximum distance for pump appliances from the building from 45m to 60m
  • Boundary distances for external fire spread are halved
  • Flats over 4.5m can be served by a single protected stair without the need for an alternative exit or increased smoke detection coverage
  • Self-closers are not required to bedroom doors in care homes, and more than 10 beds are allowed per compartment

Reference is also made in both documents to BS9991 – this code of practice for fire safety includes many alternative solutions where suppression systems are installed, including open plan flats. However BS 9991 requires comprehensive fire safety management strategies to be adopted as part of a design solution.

Sprinkler standards

There are two main British Standards for the design of sprinkler systems. BS 9251:2014 covers domestic and residential systems and BS EN 12845 covers all buildings. In most instances covered by the new regulations the domestic standard is the most appropriate and cost effective.

Watermist systems

An alternative type of fire suppression to sprinklers is a ‘watermist’ system. Mist systems release tiny droplets of water that absorb the heat from a fire and generate a steam that interrupts the combustion process. Watermist systems do not have an approved technical standard to be designed against, although there is a British Standard Draft for Development DD 8458:2010 which is at this time an un-adopted standard. Watermist systems will be considered on a case specific basis based on the manufacturers design which is in accordance with DD8458:2010.

Water supply

Where town mains are to be used, the designer must consult with the water undertaker to establish the typical operating water pressure range and flow capacities available. At this time the water undertakers in Wales will not guarantee a mains pressure suitable for a mains-fed suppression system. Therefore the 2 available system types remaining are:

  • Mains fed with in-line booster pump
  • Tank fed and pumped

There is a limited market availability of in-line booster pumps at this time, meaning that tank fed systems will be the most common solution. Where tank fed systems are used they require a low-water alarm, and dedicated sprinkler pumps also require a fault alarm. The tank must be sized in accordance with BS 9251:2014 depending on system category.

System category

There are 3 categories of system defined by BS 9251:2014, depending on building type, size, and number of sprinklers per room.

Category 1: Suitable for single family dwellings such as individual houses and flats, including small houses in multiple occupations (up to 2 floors and 5 lettable bedrooms). Also for systems serving all residences in blocks of flats up to 18m in height and less than 2400m2.

  •  Maximum number of sprinklers per room is 2
  •  Typical volume of stored water 1m3 to 1.5m3

Category 2: Suitable for blocks of flats over 18m in height, larger houses in multiple occupation, sheltered accommodation and small residential care premises (10 residents or less).

  • Maximum number of sprinklers per room is 2
  • Typical volume of stored water 3m3 to 4.5m3

Category 3: Hostels and larger residential care premises.

  • Maximum number of sprinklers per room is 4
  • Typical volume of stored water 6m3 to 9m3

Where coverage is provided to the communal areas of flats, the category will usually be adjusted upwards. Additionally, increased flow rates will be required where the system is designed as a compensatory feature, for example in the design of open plan flats in accordance with BS 9991:2015. Where the building is of a size that these parameters cannot be achieved, the system should be designed in accordance with BS EN 12845.

Sprinkler coverage

BS 9251 contains detailed clauses on sprinkler spacing and coverage, and should be referenced by the system designer. Here are some of the basic requirements for system coverage:

  • Maximum area protected by a single sprinkler head is as per the manufacturer’s listed performance or 25m2, whichever is the lesser
  • Sprinklers should be no more than 5.5m apart
  • The minimum distance between sprinkler heads is 2.4m
  • The system should be designed to cover the whole room and the walls up to 0.7m below the ceiling
  • Where the room size demands more than two sprinklers  the system must be designed as a category 3 system to cope with simultaneous activation of more than two heads.

Competency of designers and installers

Design, installation and commissioning must be carried out by competent persons, defined as: ‘a person, suitably trained and qualified by knowledge, understanding and practical experience’. A compliance certificate should be provided by the competent installer to demonstrate compliance with the British Standard.

LABC – Here to help

Our professional consultancy services cover a wide range of areas including access audits, acoustic testing and fire risk assessments.

Find out how we can help you

Registration schemes

We have a wide range of registered schemes to streamline the construction process for all involved.

Choose from our available schemes

The Planning Portal provides universal access to make online building regulations enquiries anytime direct to the building control team where your job’s located – and it’s free to use.

 

Speak to your local building control team

Click and enter your postcode to contact your local council's building control team
Contact your local team now

Footer

  • Homeowners
    • Getting started
    • Homeowner FAQs
    • Where do I get a copy of my building certificate?
    • Do I need a building regs application?
    • Front Door (home improvements website)
  • Professionals
    • LABC Services
    • Registration schemes
    • Building Regs documents
    • Commercial developments
    • Housing developments
    • Site inspection app
  • About LABC
    • Building control jobs
    • Reviews
    • Why choose LABC?
    • Scotland
  • News & blog
    • Blog
    • News
    • Press releases
  • LABC Warranty
LABC logo © 2025 LABC Membership website design by IE Digital

Contact

General - info@labc.co.uk

Footer menu

  • Privacy policy
  • Contact details
  • Copyright notice
  • Admin login
  • Accessibility

Connect with us

  • Facebook
  • Linked In
  • Twitter
  • Chi sy'n rheoli
    • 5 cam i gael cymeradwyaeth rheoliadau adeiladu
    • Cwestiynau cyffredin i berchnogion tai
      • Beth yw rheoli adeiladu?
      • Fideo: Beth yw’r rheoliadau adeiladu?
      • Will I need building control?
      • A fydd angen cymeradwyaeth rheoliadau adeiladu ar fy mhrosiect adeiladu?
      • Felly sut mae’r broses gymeradwyo’n gweithio?
      • What type of building regulations application do I need?
      • Faint fydd hyn yn ei gostio?
      • A fydd angen cymeradwyaeth rheoliadau adeiladu ar fy ngwelliannau bach i'r cartref?
      • Beth yw’r gwahaniaeth rhwng caniatâd cynllunio a rheoliadau adeiladu?
      • Pa mor hir mae’n ei gymryd i brosesu cais?
      • A oes angen i mi wneud cais rheoliadau adeiladu wrth osod ffitiad rheoledig mewn adeilad eithriedig?
      • Ydw i angen Cais Rheoliadau Adeiladu?
      • Which building control authority should I use?
      • I've been affected by the expiry of my Approved Inspector's insurance - what do I do?
      • A oes rhaid i mi ddweud wrth fy nghymdogion am fy nghynlluniau adeiladu?
      • Ble galla’i gael copi o'r dogfennau Rheoliadau Adeiladu?
      • Sut mae gwneud cais Rheoliadau Adeiladu?
      • A oes cosbau am beidio â chydymffurfio â’r Rheoliadau Adeiladu?
      • Rydw i’n meddwl gwerthu fy nhŷ – fydd arna’i angen cymeradwyaeth am waith adeiladu a wnaethpwyd cyn i mi fod yn berchen ar y tŷ?
      • Does gen i ddim y caniatâd iawn ar gyfer gwaith adeiladu - beth wna'i?
      • A gaf apelio os caiff fy nghais Cynlluniau Llawn ei wrthod?
      • Beth ddylwn i ei wneud os yw’r gwaith wedi mynd o chwith?
      • Alla'i apelio yn erbyn hysbysiad gorfodi?
      • Help - ni chawsom ganiatâd ar gyfer ein gwaith adeiladu! (Fideo)
      • Can I get retrospective building control approval?
    • Building control glossary
    • Ydw i angen cais rheoliadau adeiladu (prosiectau penodol)...?
      • Rydw i'n adeiladu addasiad atig - oes gennych chi gyngor Rheoliadau Adeiladu?
      • Oes angen cymeradwyaeth rheoliadau adeiladu i addasu fy garej?
      • A oes angen rheoliadau adeiladu ar gyfer fy estyniad?
      • Ystafell wydr
      • Oes angen cymeradwyaeth rheoliadau adeiladu ar gyfer gwaith trydanol?
      • Oes angen cymeradwyaeth rheoliadau adeiladu i wneud newidiadau mewnol?
      • Islawr
      • Porth
    • Oes angen tystysgrif gwblhau ar gyfer gwaith adeiladu yn fy nhŷ?
    • Dechrau ar eich prosiect adeiladu
    • **NEW** FAQs on Approved Inspector insurance issues
      • Why do I need building control approval for my building project?
      • Why can I choose who does my building control?
      • Why are some private building inspectors facing problems?
      • What should Approved Inspectors do once their insurance has expired?
      • What's the process for transferring work from an AI that no longer has insurance to an LABC team?
      • Why does the project have to be reverted to the local Authority?
      • What does it cost to cancel an initial notice and revert work to my local council?
      • Why do I have to pay twice – once for the Approved Inspector and then for the LABC team?
      • What will the local authority surveyor do?
      • Can Approved Inspectors continue without the required insurance?
      • What is the status of any regulatory work done in a period where an Approved Inspector fails to secure renewal of their insurance?
      • Does a cancellation notice have to be issued by the Approved Inspector?
      • What information should I request from the Approved Inspector when reverting a project to the local council?
      • What happens if I only find out my AI has no insurance once the works are completed?
      • What is the Government and LABC doing to help this situation?
      • How can I get further information/updates?
      • Who are LABC?
    • Sut mae gwneud cais Rheoliadau Adeiladu?
    • Sut mae'r LABC yn eich helpu i osgoi adeiladwyr diegwyddor
    • Ble galla’i gael copi o fy nhystysgrif adeiladu?
    • Pam dylwn i ddefnyddio rhywun mewn Cynllun Personau Cymwys (CPS)?
    • Pam mae rheoli adeiladu'n bwysig?
  • Gweithwyr proffesiynol
    • Canllawiau Rheoliadau Adeiladu
      • Dogfennau Cymeradwy a chanllawiau technegol Lloegr
        • Approved Document A: Structure
        • Approved Document B: Fire Safety – Volumes 1 & 2
        • Approved Document C: Site preparation and resistance to contaminants and moisture
        • Approved Document D: Toxic substances
        • Approved Document E: Resistance to the ​passage of sound
        • Approved Document F: Ventilation
        • Approved Document G: Sanitation, hot water safety and water efficiency
        • Approved Document H: Drainage and waste disposal
        • Approved Document J: Combustion appliances and fuel storage systems
        • Approved Document K: Protection from falling, collision and impact
        • Approved Document M: Access to and use of buildings
        • Approved Document P: Electrical safety - Dwellings
        • Approved Document Q: Security - Dwellings
        • Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks
        • Approved Document L: Conservation of fuel and power
        • Building Regulations - Regulation 7: Materials and workmanship
      • Approved Documents and technical guidance Wales
        • Wales Approved Document K: Protection from falling, collision and impact
        • Wales Approved Document A: Structure
        • Wales Approved Document Part B: Fire Safety
        • Wales Approved Document Part C: Site preparation and resistance to contaminants and moisture
        • Wales Approved Document Part D: Toxic substances
        • Wales Approved Document Part E: Resistance to the passage of sound
        • Wales Approved Document F: Means of ventilation
        • Wales Part G: Sanitation, hot water safety and water efficiency
        • Wales Approved Document H: Drainage and waste disposal
        • Wales Approved Document J: Combustion appliances and fuel storage systems
        • Wales Approved Document L: Conservation of fuel and power
        • Wales Part M: Access to and use of buildings
        • Wales Approved Document N: Glazing
        • Wales Approved Document P: Electrical safety - Dwellings
        • Wales Approved Document Q: Security - Dwellings
        • Wales Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks
        • Wales Approved Document to support regulation 7: Materials and workmanship
      • Archive
        • Archif Dogfennau Cymeradwy
        • Archif Gwybodaeth Statudol
        • Canllawiau harchifo
      • Ffocws
        • Circulars
        • Mandatory Fire Suppression for Wales - A Technical Guide
      • Canllawiau statudol
    • Cymwysterau rheoli adeiladu
      • Prentisiaethau rheoli adeiladu'r LABC
        • Register your interest in the apprenticeship degree webinar
    • Gwasanaethau LABC
      • Air tightness testing
      • Archwiliadau mynediad
      • Acwsteg
      • Gwasanaethau ynni
      • Peirianneg Tân
      • Asesiadau risg tân
      • Get a quote
      • Gwarantau adeileddol
    • Hyfforddiant
      • Hyfforddiant mewnol
      • Our training team
      • What people are saying about our conferences and training....
      • Cwestiynau cyffredin hyfforddiant
        • How do I book a course?
        • What is CPD?
        • I'm not sure which training course is right for me
        • Will my course count towards my CPD?
        • What do I do if I want to attend a course but there are none in my region?
        • Will I receive confirmation of my booking?
        • How do I pay for an LABC training course?
        • What are LABC's booking terms and conditions?
        • What is LABC Pre-Pay?
        • What is a purchase order number?
        • Where do I send my purchase order number?
        • Will my invoice need to be paid before I attend a course?
        • Who do I contact if I have invoicing queries?
        • What if I haven't received the joining instructions?
        • What do I need to bring with me to the course?
        • What's the dress code?
        • Who'll be running the course?
        • Will lunch be provided?
        • Can I transfer my place to someone else?
        • I can't find the answer to my question!
      • Aelodaeth o'r CIOB drwy'r LABC
    • Building Bulletin email newsletter
    • Cynlluniau cofrestru
      • LABC Assured
      • Partner Authority Scheme (PAS)
        • Partner Authority Scheme application form
      • Registered Construction Details
    • Hwb Safonau'r Adeiladwyr Proffesiynol
    • Datblygwyr masnachol
      • Education projects
      • Fit-out projects
      • Healthcare
      • Office developments
      • Retail
      • Sports stadiums and arenas
      • Meistri Adeiladu: LABC (Fideo)
    • Housing developers
      • Conversions
      • Cartrefi newydd
      • Social housing
      • LABC and house builders
  • Amdanom LABC
    • Contact
    • Gyrfaoedd
      • Building control jobs
      • Beth yw syrfëwr rheoli adeiladu a sut galla'i fod yn un?
      • Daniel Anon - Trainee of the Year 2017 (Videos)
      • In the spotlight: Building Control Manager Angela Edwards
      • Introducing LABC Trainee of the Year 2016: Jack Pritchard!
      • My building control story - Seb Jackson
      • Technical support in building control
      • We're hiring
    • LABC Board of Directors
    • Charity of the year
    • Sefydliadau rydyn ni'n eu cefnogi
    • Adolygiadau a geirdaon
    • Gweithio gyda'r LABC
    • Rhanbarthau'r LABC
      • LDSA (London District Surveyors' Association)
        • LDSA region contact details
    • Polisi preifatrwydd
    • Copyright and ownership of LABC intellectual property
    • Meet the LABC team
    • Pa wasanaethau rydyn ni'n eu cynnig ar y wefan?
    • Pam dewis rheoli adeiladu awdurdod lleol?
    • Beth yw'r Rheoliadau Adeiladu?
    • LABC Publishing
  • Newyddion
    • Self build homes
    • Blog posts
    • Press releases
    • Research
    • Building Safety & Hackitt press releases, articles and resources
  • Gwobrau
    • Awards region deadlines
    • Awards team contact details
  • LABC Academy
    • How to apply
    • What is a building control surveyor?
    • How do I become a building control surveyor?
    • Building Control Blog
      • Be part of the most significant change in construction in more than 30 years
      • Why not consider a career in building control with the opportunity to progress?
      • Building control – improving public safety
  • Training